CT Offshore’s new trencher ROV, the CTO 107-1100, will be deployed at DONG Energy’s Gode Wind 1 + 2 Offshore Wind Farms. CT Offshore will install the 97 inter-array cables.
The new subsea trencher ROV (remotely operated vehicle), CTO 107-1100, is purpose built for the cable laying industry. The new trencher ROV has an operating depth of 100 metres but with an option of up to 1,500 metres, which means that the trencher ROV also can be used for various other industry cable laying tasks besides inter-array cabling at offshore wind farms.