
The E-160 EP5 has a nominal power of 4.6MW. At sites with an annual average wind speed of 7.5 m/s at hub height, the wind energy converter type will generate an energy yield of more than 19,615 megawatt-hours (MWh) every year. The prototype at the Wieringermeer site was built on a modular steel tower (MST) with a hub height of 120 metres.