Ferrovial has been selected for the manufacturing and assembly of the SATH floating platform in the DemoSATH project lead by Saitec Offshore Technologies in collaboration with RWE Renewables.
The construction package will last 14 months and covers site preparation, concrete precasting, procurement of steel bulkheads and assembly of the floater along with management of the supply chain. Work will start in November 2020 and will create around 60 local jobs during the peak of the project. For the prototype, the structure and the 2MW wind turbine will be assembled in the port of Bilbao. The base of the structure will be approximately 30 meters wide and approximately 64 meters long. The platform, including the turbine, will be towed to its anchorage point in a test field (BIMEP) 2 miles off the coast at a depth of 85 meter. Hybrid mooring lines, composed by chains and fiber, anchored to the seabed will hold the floating body in position. The unit is expected to go into operation early 2022.