Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


BladeRunnerNabrawind Technologies has introduced BladeRunner, a new blade installation and de-installation system. The system is crane-free and can be used for blades up to 80 meters long and a team of four people is able to operate it.
 
The system has been tested at a wind farm owned by the French developer Innovent in Bignan (France) to replace a damaged blade with a new one. The system is based on the installation of equipment on the hub of the wind turbine, which is used to directly manipulate the blade, which ascends and descends in a vertical position. The system is connected directly to the inserts or T-Bolts of the blade root and its weight is less than 1000KG.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.