Goldwind has introduced its 2MW GW115 and GW108 wind turbines.
The wind turbines are designed for locations with low wind speeds and were tested in early 2014 in Zhangbei, northern China. The machines are based on Goldwind's 1.5MW and 2.5MW platforms. Hubai Group has signed a strategic framework agreement for 500MW of G115 turbines.