Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Concrete tower NordexNordex looks back on 13 years of experience in the manufacture of concrete towers. In 2006, the first AW1500 turbine was installed on an 80 metre concrete tower in Spain. Recently the 1000th concrete tower for an AW125/3000 machine left the Brazilian factory.
 
The concrete towers made by the Nordex Group consist of 20 metre-long prefabricated convex segments that can be assembled on site when the wind farm is under construction, and can be "stored" vertically on the wind farm until the nacelle is mounted. As the concrete tower facility is mobile, after completion of a wind farm, the structural forms and tools can be transported to the next project within the country. Today, the Nordex Group can draw upon 11 such mobile manufacturing facilities worldwide, in Latin America, India, South Africa and Spain.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.