Senvion has installed its first 3MW turbine in North America, the Senvion 3.2M114. The turbine has a rated output of 3.2MW, hub height of 100 metres, and a rotor diameter of 114 metres.
It is the first of 46 turbines to be installed at the Mesgi'g Ugju's'n (MU) Wind Farm (a 50-50 partnership between the three Mi'gmaq Nations of Quebec and developer Innergex). The 3.2M114 has been in service in Europe since 2012, and has been specially adapted for North American requirements. The turbine is fully equipped with a hot air anti-icing system.