Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


The independent power producer Terra-Gen upgrades 20 Vestas V47 wind turbines which are installed in their Pacific Crest wind farm located in Tehachapi, California, with a control retrofit solution from Deif. Deif’s control retrofit solution extends the turbine lifetime and optimises the turbine performance in terms of variable speed concepts, extended cut-out and adaptive power setpoint.
 
With the company’s retrofit control solution for Vestas V47, the turbines can operate without the VRCC (Vestas Rotor Current Control) and at the same time run above 600 kW and as close to the rated power level as possible. For Terra-Gen the retrofit solution from DEIF means that they have no VRCC related costs such as spare parts, lost production due to downtime and derating and they aim to reach a 3-year ROI.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.