Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


With this platform upgrade, Vestas increases performance in all wind classes, increasing annual energy production by up to 12 per cent depending on site-specific conditions.

The upgrade’s most significant elements include larger rotor sizes in all wind classes; nominal power rating increase to 3.45MW; optional power modes of up to 3.6MW; tower heights of up to 166 meters; and the introduction of a new control system designed specifically for Vestas turbines. The 3MW platform becomes available with five rotor variants, two nacelle configurations, multiple power modes, and 15 hub heights. Delivery of the upgraded 3 MW platform will start in the fourth quarter of 2016.

 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.