X1 Wind has announced that its X30 floating wind prototype, installed in the Canary Islands, successfully produced its first kWh.
First power’ was fed into Plocan's offshore platform smartgrid via a 1.4km underwater cable connected to a 20kV transformer. Local teams will now enter the last phase of a test and verification programme which started with the platform installation in November 2022. The X30 platform is equipped with a specially adapted V29 Vestas turbine and ABB power converter.