CWind has announced that DONG Energy has granted CWind a two-year extension to its existing three-year crew transfer vessel contract at the West of Duddon Sands Offshore Wind Farm in the Irish Sea.
CWind will provide vessels for Operations & Maintenance (O&M) to the 108-turbine West of Duddon Sands site, including a summer campaign to ensure the site remains operating at peak performance throughout the busier summer months. Three crew transfer vessels (CTVs) have been dedicated to the project, comprising a pair of 19-metre resin-infused Multi-Purpose Catamarans (MPCs) and one Small Water-plane Area Twin Hull (SWATH) vessel.