CSIC Haizhuang Windpower will equip all 47 turbines of its wind farm located in Xinjiang, Western China with fos4X blade load monitoring systems (Turbine Load Control - TLC).
The order includes turbine load control systems for all 47 2.X MW turbines of the wind farm to control and reduce loads. In addition, two evaluation systems will be provided to analyse the added value of the system. Delivery will take place in July and August 2019 to the wind farm, which is expected to be fully installed and commissioned in September 2019.