Fulkrum has secured a contract to support the QA/QC activities for the Dogger Bank Wind Farm project. Fulkrum will provide inspection services during the Dogger Bank A development stage, with a possibility of contract extension to zones B and C, ensuring conformity and quality of the wind turbines and main components, including blades, tower sections and nacelle.
Located off the east coast of Yorkshire, Dogger Bank will consist of 277 GE Haliade-X turbines of 13 MW and 14 MV, with each of the three zones having an installed generation capacity of 1.2GW.