Gamesa has concluded implementation of its Energy Thrust programme for a French utility at 28 wind farms located in Spain, Portugal, France and Poland.
This upgrade suite, which boosts average turbine output by up to 5%, has been installed in Gamesa-made turbines from its 850kW and 2MW platforms with total capacity of 872MW. Gamesa developed Energy Thrust to make its 660kW, 850kW and 2.0MW platforms more efficient. Gamesa has also entered into an agreement with a power utility for the renewal of its operations and maintenance services covering 305MW of installed capacity. As a result, the company will continue to service 286 turbines from its 850kW and 2MW platforms located in several wind farms in Spain and Portugal.