Gamesa has secured a new order from Força Eólica do Brasil (FEB), a consortium made up of Iberdrola and Neoenergia, for the supply of 42 of its G114-2.0MW turbines (84MW) at three wind farms located in Rio Grande do Norte, in north-eastern Brazil.
Gamesa will supply, transport, install and commission 15 turbines at the Santana 1 wind farm, 15 turbines at the Calango 6 facility and another 12 at the Santana 2 complex. These turbines, which will be made at Gamesa’s factory in Camaçari (Brazil), are due for delivery during the third quarter of 2016, while the wind farms are slated for commissioning the following quarter.