Gamesa has received two new supply contracts in China.
The first is a new contract with CGN Wind Energy, a subsidiary of China's General Nuclear Power Group, for the supply of 64MW; the second is with Everbright, a subsidiary of Chinese renewable energy specialist Everbright Group, for the supply of 48MW. The scope of the agreement with CGN encompasses the supply and installation of 32 of Gamesa’s G97-2.0MW turbines, specifically configured for high-altitude locations, at the Yangchajie wind complex located in the province of Yunnan, in southeast China. The turbines are slated for delivery in January 2015, while the facility is expected to be commissioned in March 2015. The agreement with Everbright includes the supply and installation of 24 G97-2.0MW turbines at the Zhaojiashan wind farm in the province of Shanxi, in western Peking. These turbines are to be delivered in March of next year and the project is expected to be fully commissioned by May.