GE Renewable Energy has been selected by Repsol to supply 22 units of its 6.1 MW wind turbines to six of the wind farms in its Delta II project (Santa Cruz I, Amp, II, III, and San Isidro I and II) in Aragon, Spain.
These six wind farms will have a total combined capacity of 133 MW and will supply energy to the equivalent of 100,000 homes. The blades will be manufactured by GE's wind turbine blade subsidiary, LM Wind Power, which operates from Ponferrada (León) and Castellón in Spain. The wind turbine towers will also be produced in Spain, while the nacelles will be produced in Salzbergen, Germany. The Delta II project is Repsol's largest renewable project currently under construction, with a total capacity of 860 MW.