Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Warradarge Turbine Set upAs owner’s engineer, GHD is helping its clients position Western Australia as a leading adopter of renewable energy. Bright Energy Investment’s Warradarge Wind Farm (183 MW) and Greenough River Solar Farm Stage 2 (30 MW) along with Alinta Energy and RATCH- Australia’s Yandin Wind Farm (214 MW) will provide energy to residential and industrial consumers who are connected to Western Power’s South West Interconnected Network.
 
As owner’s engineer on all three projects, GHD’s role includes design review, commissioning support, contract compliance monitoring, project management, contract administration, document control, advice, and site supervision. As part of GHD’s services, full-time site representatives were present for the duration of construction plus commissioning and worked collaboratively alongside the client and construction contractor teams and all three projects will be connected before the peak of summer.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.