Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Global Marine Systems Limited has begun subsea cable installation work on the Beatrice Wind Farm Demonstrator Project (Beatrice Project), a flagship project for offshore wind energy development.

The initial project will use two wind turbines 25km off the east coast of Scotland to test the viability of the Beatrice Oil Field as a future site for a commercial deep water wind farm. Using its Cable Ship Sovereign, Global Marine will install two main cables, each comprising a power and fibre optic cable, to connect the two 5MW turbines to Talisman’s Beatrice Alpha oil platform. The cable installation will enable Talisman to power Beatrice Alpha using energy generated from the turbines and also remotely control and monitor certain aspects of the turbines’ performance from the oil platform, such as altering blade pitch and sending back turbine performance data for analysis.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.