Iberdrola Renewables has announced a 25-year contract to supply Tri-State Generation and Transmission Association, Inc. (Tri-State) with renewable energy from the planned Twin Buttes II Wind Project.
Tri-State will purchase the entire output of the 76MW wind farm, when the project is expected to be completed in 2017. The Twin Buttes II project will consist of 38 wind turbines.