Inneo Torres has signed a contract with Acciona Windpower for the supply of towers with a height of 100 and 120 meters, for their AW-3000 turbine, for the installation of more than 600MW.
The towers, full precast concrete, are manufactured in keystones in the
factory and then they are transported, using extendable platforms, to
the wind farms where they will be assembled. Inneo Torres will be
opening a new factory in the summer of 2010, which will compliment the
production activity of its current facilities in Talavera de la Reina
(Toledo).