E.ON has announced the final design for the Rampion Offshore Wind Farm project, after receiving consent from the Secretary of State for Energy and Climate Change in July 2014.
Situated 13 kilometres off the Sussex coast at its nearest point, the 72km2 final wind farm would feature 116 turbines, each measuring around 140 metres high to tip. It would have the capacity to generate 400MW of electricity. A final timetable for construction is yet to be finalised.