With the installation of a N163/5.X turbine at the Kalistanneva wind farm in Finland, the Nordex Group has now exceeded the 5 GW threshold of installed capacity in the Nordic region.
A total of 1,234 turbines made by Nordex are currently in operation in Denmark, Finland, Sweden, and Norway. Distributed by country, 2.6 GW is accounted for by wind farms in Finland, 1.6 GW by parks in Sweden, 641 MW by parks in Norway, and 152 MW by wind farms in Denmark.