The Nordex Group has received another large order for the N149/4.0-4.5 from the Delta4000 series. The order includes a total of 56 turbines as well as a two-years service contract for an undisclosed project in the USA.
Installation of this project in the North of the USA is scheduled to start in summer 2020. The machines are to be operated in the 4.8MW mode and are to be supplied in the Cold Climate version.