SSE Renewables has commissioned the Nordex Group to supply 29 N117/3600 turbines for the "Yellow River" wind farm in Ireland. The contract also includes service for the turbines post commissioning.
The Nordex Group will install the turbines for the "Yellow River” wind farm on tubular steel towers with overall tip heights at 156 and 166 metres. Delivery and installation work near to the village of Rhode in County Offaly are due to start at the end of 2023.