Wind Energia has placed an order with the Nordex Group for the supply and installation of 16 N117/3000 turbines for the 48MW Nozdrzec wind farm. The company is a subsidiary of Yevuley Shemesh (YVS) Renewable Energy, which is based in Israel.
The order also includes a service agreement for the turbines covering a period of 20 years. The Nozdrzec wind farm is being built in the south-east of Poland in the province of Subcarpathia. The N117/3000 turbines will be installed by the Nordex Group as of summer 2023 on tubular steel towers with a hub height of 134 metres. The final turbine is scheduled to go into operation at the end of 2023.