Nordex Group has received a 300 MW turnkey order from Sprng Energy Private Limited. The project Mulanur is located in the state of Tamilnadu, near to the city of Coimbatore.
Under the turnkey contract, Nordex will supply, erect and commission 100 AW140/3000 turbines with 3MW installed capacity, rotor diameters of 140 meters and hub heights of 120 meters. Construction of the wind farm is scheduled to commence in May 2019 and is to be completed at the beginning of 2020. The Nordex Group will build the turbines and rotor blades in its local factories near Chennai. The 120-metre concrete towers are also to be produced locally, in the Nordex factory located in Tamilnadu within the vicinity of the wind farm.