In the first quarter of 2011 Nordex will be shipping a total of twelve 2.5MW wind turbines to Northern Ireland and the south-west of the Republic of Ireland from its European production centre in Rostock, Germany.
In January 2011 the wind turbine manufacturer is to install the first six N90/2500 turbines at the “Grouselodge” Wind Farm located in County Limerick. The other six turbines from the N80/2500 strong-wind series will be constructed by Nordex to the south of Londonderry city at the “Curryfree” wind farm. “Curryfree” wind farm was developed and is being constructed by Renewable Energy Systems Ltd (RES). Both wind farms are owned by ESB International.
In January 2011 the wind turbine manufacturer is to install the first six N90/2500 turbines at the “Grouselodge” Wind Farm located in County Limerick. The other six turbines from the N80/2500 strong-wind series will be constructed by Nordex to the south of Londonderry city at the “Curryfree” wind farm. “Curryfree” wind farm was developed and is being constructed by Renewable Energy Systems Ltd (RES). Both wind farms are owned by ESB International.