Super Energy Corporation Public Company Limited (Super) have awarded Pöyry with an owner's engineering services assignment for a 340MW wind farm project. The project is made up of 6 sub-projects located in Ca Mau, Bac Lieu, and Soc Trang provinces, in Vietnam.
Super is a Thailand-based renewable energy developer with a plan to spend about US$ 600 million in the next three to four years in expanding its renewable energy portfolio to meet the rising demand in Southeast Asia. Pöyry's assignment includes a feasibility study, wind turbine generator supplier selection, technical review of EPC contracts, and project management and engineering design review for the wind farms. Among the 6 sub-projects, the 40MW wind farm facility located in Ca Mau is set to be completed first in the second quarter of the year 2020, followed by the 30MW wind farm in Soc Trang Phase 1, which is set to be completed by mid-2020 and the 142MW wind farm in Bac Lieu, which is set to be completed by the end of 2020. The value of the order is not disclosed.