Denker & Wulf AG and REpower Systems AG have signed a contract for the delivery of 22 wind turbines to Mecklenburg-Western Pomerania. The REpower 3.4M104 turbines, each with a rated output of 3.4MW, are planned for the Hohen Luckow project southwest of Rostock and are to be constructed by summer 2012.
It is the first major project in which REpower installs this turbine type with a hub height of 128 meters and a concrete and steel hybrid tower. The 22 turbines for the Hohen Luckow wind farm have a total rated output of 74.8MW. In addition to delivering and installing the turbines, REpower will be responsible for servicing and maintaining them. It is for this that the companies have concluded a contract for an integrated service package (ISP) with a 15-year term.
It is the first major project in which REpower installs this turbine type with a hub height of 128 meters and a concrete and steel hybrid tower. The 22 turbines for the Hohen Luckow wind farm have a total rated output of 74.8MW. In addition to delivering and installing the turbines, REpower will be responsible for servicing and maintaining them. It is for this that the companies have concluded a contract for an integrated service package (ISP) with a 15-year term.