
The first Vestas turbine of a total of 114 was commissioned and connected to the grid on August 22. The 1,075MW wind farm is expected to be fully operational in the first half of 2023. When fully operational, the site will produce around 5 terawatt hours (TWh) of renewable electricity per year.