Senvion has especially adapted its 6.2M152 wind turbine to the floating offshore foundation developed by the EolMed consortium, led by Quadran.
The French environment and energy management Agency (ADEME) has awarded EolMed for the construction of three to four Senvion 6.2M152 in the French Mediterranean Sea, for the first floating pilot wind farm in France which is intended to be installed and commissioned in 2020. The Senvion 6.2M152 features a rotor diameter of 152 metres and due to a larger rotor diameter compared to its predecessor Senvion 6.2M126 (126 metres), the energy yield at wind speeds of 9.5 m/s is increased by up to 20%.