Sif Holding will manufacture 70 TP-less design monopiles (65 kton steel) for Van Oord. Van Oord is contracted by operator CrossWind for the construction of the 759MW project Hollandse Kust Noord in The Netherlands.
CrossWind is a joint venture between Shell and Eneco. Sif’s scope comprises manufacturing of the monopiles and storage at the MV2 facility in Rotterdam in 2022- 2023.