Tekmar Energy has supplied its Teklink Cable Protection System (CPS) to protect the underwater power cables as they enter the wind turbine foundations on the Formosa 1 Phase 1 Offshore Windfarm project, the first offshore windfarm in Taiwan.
Formosa 1 Phase 1 is the first phase of the Formosa 1 Offshore Windfarm project which consists of two 4MW Siemens turbines located in the Miaoli region of Taiwan.