Tekmar Energy has announced multiple cable protection system (CPS) supply contracts to protect over 1,200MW of new offshore wind generating capacity in China.
The contracts will see Tekmar Energy engineer, manufacture and supply over 250 of its cable protection systems for four new offshore wind farm projects in the region. The projects include Shandong South 4 (300MW) located on the Jiaodong Peninsula in Eastern China, Yangjiang Shapa – Phase V (300MW) located off Guangdong in the South China Sea, and Dafeng H8-2 (300MW) and Rudong-H2 (350MW) located off the coastal province of Jiangsu in Eastern China. The systems will be manufactured at Tekmar Energy’s Newton Aycliffe production facility in the North East of England and exported to China in 2021.