Tekmar Energy has been awarded a contract by Dong Energy to supply 189 cable protection systems (CPS) for its Race Bank offshore windfarm in North Norfolk.
Tekmar will provide its seventh generation TekLink mechanical latch system, which includes a specially-developed quick connect design. For Race Bank, Tekmar has worked with Dong Energy to engineer a standardised CPS design for the project which offers maximum flexibility during the installation activities offshore. These systems will be delivered from its manufacturing facility and headquarters in Newton Aycliffe, County Durham. The contract represents the ninth Dong Energy project that Tekmar has worked.