µ-Sen GmbH has now provided the first M5000 offshore wind turbine from Multibrid with a new offshore Condition Monitoring System (CMS).
The wind energy plant (WEP) is located in Bremerhaven. In a joint project with IMO-WIND, µ-Sen has worked on the advancement of its own CM systems for use at sea. In this joint research network with seven partners, µ-Sen concentrates on the development of an integral monitoring and evaluation system for offshore wind energy plants. The CMS will now also be installed in other turbines, after Multibrid received an order in June 2007 for the supply of the first six turbines for the German offshore test field, "alpha ventus". Located 45 kilometers off the coast of the island of Borkum at a water depth of over 30 meters.