Nordex has signed delivery and service contracts for four projects in Turkey entailing a total of 50 turbines with a combined total capacity of 125MW.
38 N100/2500 turbines are to be connected to the grid for Eksim Holding by autumn 2013. 20 turbines will be built at the Hasanbeyli wind farm in Eastern Turkey close to the town of Osmaniye. Nordex is also installing a further wind farm with 18 2.5 MW turbines for Eksim close to Silivri near Istanbul. Nordex is also supplying Dost Enerji with 12 N90/2500 turbines. One of these will be added to the Yuntdag wind farm, which has since been enlarged to 23 Nordex turbines. Nordex is assembling the other eleven turbines at the Geres wind farm in the direct vicinity of Yuntdag.