The Design of a Cost-Effective Turnkey Solution
Before an offshore wind farm site is installed, there must be a geographical survey, wind analysis and environmental impact study for the area in consideration. To conduct these surveys and studies it is beneficial to have a site monitoring. In this article the authors describe the design considerations for such a system.
Before an offshore wind farm site is installed, there must be a geographical survey, wind analysis and environmental impact study for the area in consideration. To conduct these surveys and studies it is beneficial to have a site monitoring. In this article the authors describe the design considerations for such a system.
By Hans-Jorgen Hansen and Steven Thumbeck, MacArtney A/S, Denmark
.