Hexicon and Elia Grid International (EGI) join forces to connect the wind energy produced by floating offshore wind farms to the onshore grid. The two companies will develop concepts and projects to integrate large scale floating offshore wind parks into the onshore power systems.
The 5-year long cooperation consists of two phases, covering the provision of expertise during both the pre-development and the development phases of the projects. Work is expected to start in June 2022. EGI is a consultancy company with experience and know-how about onshore and offshore transmission systems.