Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Menck has introduced the MHU 6000W Wind Hammer, engineered to drive larger piles in challenging environments and install longer piles in deeper waters.
 
The Wind Hammer delivers between 200 kJ and 6,250 kJ of energy to drive monopiles with diameters of up to 9 metres and beyond. Key features include a double-acting hydraulic drive, closed-loop control, shock absorber cartridges, and safety mechanisms. The Wind Hammer can also be equipped with the Menck Noise Reduction Unit (MNRU).
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.