Mingyang Smart Energy's hight steel-concrete hybrid tower solution has entered the commercialisation phase, with the installation of the first batches of MySE 4.0-166 & 173 wind turbines with a 160m hub height in Anhui, China.
The hybrid tower has a segmented, prefabricated and prestressed structure that allows for easy transportation and adaptability to various terrains. It has been certified by DNV-GL and can be customised and optimised for large turbines of 4MW+.