Goldwind has completed the construction and delivery of a 1600-tonne offshore wind installation vessel in Nantong, Jiangsu Province, China.
By adopting the "transport + storage + lifting" integrated approach, the vessel is able to lift wind turbines surpassing 20MW, along with their fixed support structures, and can operate in water depths of up to 70 metres.