On 28 December 2015 Nordex installed the first N131/3300 turbine. This low-wind turbine, especially designed by the manufacturer for inland sites in Germany, was set up in the "Krampfer" wind farm in Brandenburg for the customer VOSS Energy GmbH, based in Rostock.
Originally six N131/3000s were planned for this project, which Nordex was to install for the customer in January. As the N131/3300 with its hub height of 134 metres has already obtained the certificates on the type test, VOSS Energy decided to substitute one of the Delta machines with a newer variant. Depending on the site, this produces higher yields of between four and six percent compared to the older model. Nordex will install the remaining five N131/3000 turbines in January, as planned. The turbine now installed will be commissioned in the course of the next few days and connected to the grid before the end of the year. After commissioning Nordex will immediately start making the necessary measurements in order to validate the power curve and verify the sound power level.