Ørsted has implemented Shoreline´s O&M simulation and data analytics solution to perform long term operational logistics optimisation to support the company’s development of wind farm business cases.
Shoreline´s O&M Design simulation solution allows Ørsted to perform a detailed long-term simulation of the operational logistics for any of the company’s existing and future wind farms. With this system, Ørsted is able to optimise the operational setup for its sites and be provided with operational and financial Key Performance Indicators (KPI’s). The company’s cloud-based, patented and scalable simulation technology allows customers to build virtual models of wind farms, to simulate and optimise the construction and operational phase during project development, and the daily operation once in operation.