
The project was executed in collaboration with Swire Blue Ocean and a range of. We unloaded the 115-meter-long crane boom on the quayside of the port of Esbjerg to perform electrical installations and tests before completing a twin-lift with two heavy shore cranes and mounting the crane on Pacific Osprey for the final load tests.