
The hull is being built at Crist, Poland, while the engineering, outfitting and system integration, equipment preparations, testing, sea trials and finalising will be carried out at Ulstein Verft, Norway. The ST-297 CLV is designed by Skipsteknisk. The vessel will be outfitted for power cable laying, including bundle laying, cable jointing, repair, cable system protection and trenching. She will be delivered in 2021.