All 60 six-megawatt wind turbines of the Arkona offshore wind farm are built. The joint project between E.ON and the Norwegian energy company Equinor completed the installation of the wind turbines in the German Baltic Sea in three months.
The wind farm Arkona has been producing renewable energy since September 2018. The construction of the offshore wind farm will be completed within the next few months. Arkona is scheduled to go into full operation in 2019.