Equinor and the Snorre and Gullfaks partners have made a final investment decision for the Hywind Tampen offshore wind farm development. two updated plans for development and operation have been submitted to Norwegian authorities. The oil and gas platforms will be the first ever powered by a floating offshore wind farm.
The wind farm will be located some 140 kilometres from shore in 260-300 metres of water between the Snorre and Gullfaks platforms. The Hywind Tampen investments will total almost NOK 5 billion. The wind farm will consist of 11 wind turbines based on the Hywind technology developed by Equinor. The 8 MW turbines will have a total capacity of 88 MW, capable of meeting about 35 percent of the annual power demand of the five Snorre A and B, Gullfaks A, B and C platforms. Scheduled to come on stream in late 2022 Hywind Tampen will be operated from Equinor’s Bergen office. Gulen Industrihamn in western Norway has been chosen for the assembly of the floating wind turbines for Hywind Tampen before being transported to the field in the North Sea.