Bureau Veritas, in partnership with the Korean Register (KR), has been appointed to lead the project certification of Bada Energy’s Gray Whale 3, a floating offshore wind farm project in Ulsan, Republic of Korea.
Gray Whale 3 floating offshore wind farm is a product of a partnership between Corio Generation and TotalEnergies. Under the plan, a floating offshore wind farm is being built 70 km off the coast of Ulsan, at a water depth of 150 metres. The project aims to be in operation by the end of 2026 and will have a grid connection with a capacity of approximately 500 MW. Bureau Veritas will provide project certification services. This covers a conformity assessment of the complete floating offshore wind farm and conformity assessments related to design, manufacturing, transportation, installation, and operation, including a review of the Front End Engineering Design (FEED).